Polk City SR-33 Water Main Extension
Project Team:
Steven L. Elias, PE - Project Director
In order to provide water service to a new planned development within the City, the City of Polk City retained Envisors to design a water main extension along State Road 33. The Project consisted of surveying, designing, permitting and administering construction of approximately 10,500 feet of 10-inch PVC water piping. The new water main extended from Lake Margaret Drive to Mount Olive Road along the FDOT Right of Way.
Envisors surveyed the proposed water line corridor and prepared construction documents (plans and specifications) for this Project. Envisors also obtained all necessary permits, administered construction, and prepared Record Drawings for the City’s records.