Below is a selection of our recently completed projects. Click on an image or link for more detailed information about each project.
|
|
Water Ridge Community Envisors was retained by R.A. Florida Development to perform surveying, land planning (zoning and land use changes), civil engineering design, and permitting services for a large single family residential development within the City of Auburndale... |
|
|
City of Winter Haven Fire Station No. 1 Facility Envisors was retained to work under a construction manager at risk arrangement with the City of Winter Haven and McCree Design Builders to prepare the civil site engineering construction plans, assist with the attainment of permits, and perform... |
|
|
Central Avenue & Central Park Improvements The Winter Haven CRA prepared a Downtown Community Redevelopment Plan (CRP) to systematically address downtown issues and community needs, including enhancements to the downtown drainage system and the physical appearance of the urban space. The CRP... |
|
|
Adams Barn Road Reconstruction R.A. Florida Development, Inc. (RAFD) purchased approximately 300 acres of citrus grove on each side of Adams Barn Road in Polk County for development as a 650-unit single family residential community. In order to accommodate the proposed subdivision... |
|
|
Road & Intersection Improvements, Reynolds Road & Main Avenue This project was intended to resolve long term road flooding problems along Reynolds Road and to make capacity improvements to the Reynolds Road and Maine Avenue intersection. This project involved serious flooding of a major industrial intersection... |
|
|
US Highway 27 & Crump Road Intersection Improvements The primary purpose of this project was to evaluate the existing geometric conditions of the intersection and prepare contract bid documents for construction of the roadway approaches and mast arm signal for the intersection of SR 25 (US 27) and Crump... |
|
|
Lake Jackson Shores Wastewater Collection and Transmission System Improvements In response to an FDEP mandate, the City of Sebring was required to remove/relocate sewer lines and force mains that served approximately 140 residences from the Lake Jackson Shores subdivision, adjacent residential areas, and the Lakeview Towers... |
|
|
Polk City SR-33 Water Main Extension In order to provide water service to a new planned development within the City, the City of Polk City retained Envisors to design a water main extension along State Road 33. The Project consisted of surveying, designing, permitting and administering... |
|
|
Webber International University Wastewater Treatment Facility Expansion The old Webber International University WWTF was permitted for 20,000 gpd Average Day Flow (ADF). The treatment process utilized an extended aeration process and effluent was disposed of in two adjacent percolation ponds. |
|
|
Riverwalk Town Center Envisors was retained by the Dean R. Erskine Irrevocable Trust to perform land planning (zoning and land use changes), civil engineering design, and permitting services for a mixed commercial use development in the northern area of Mulberry, Florida... |
|
|
CSX Intermodel Logistics Center Site Envisors provided the following survey services for this project:
|
|
|
ANNUAL COAL STOCKPILE INVENTORY SERVICES Envisors was retained by the City of Lakeland to provide professional surveying and mapping services to prepare high accuracy volume, density, and dry tonnage quantity estimates for the City of Lakeland Electric coal stockpiles located at the C.D.... |
|
|
US Highway 27 Expansion & Improvement Project Envisors was retained by Westra Construction Corporation to provide surveying services on a 2.6 mile roadway project for US Highway 27 from north of SR 542/Dundee Road to north of SR 546, in Polk County, Florida, beginning August 2007 and ending April... |
|
|
Hampton Inn Envisors was initially retained to perform the design and permitting of a new Hampton Inn hotel on US 27 across from the Eagle Ridge Mall. We were subsequently retained to perform construction staking and FDOT-related CEI services for the entrance... |


